{"id":1070,"date":"2021-01-04T16:58:04","date_gmt":"2021-01-04T15:58:04","guid":{"rendered":"http:\/\/www.miriamlanzetta.com\/?p=1070"},"modified":"2026-07-20T13:52:37","modified_gmt":"2026-07-20T11:52:37","slug":"change-management-plan","status":"publish","type":"post","link":"https:\/\/www.miriamlanzetta.com\/en\/2021\/01\/04\/change-management-plan\/","title":{"rendered":"How to develop a Change Management Plan"},"content":{"rendered":"<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>Change management is an organized, systematic application of the knowledge, tools, and resources of change that provides organizations with a key process to achieve their business strategy.<\/p><cite>Wanner, M. F. (2013). Integrated change management. Paper presented at PMI\u00ae Global Congress 2013\u2014North America, New Orleans, LA. Newtown Square, PA: Project Management Institute.<\/cite><\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">Today more than ever, the level of competitiveness of an organization is directly proportional to its ability to manage changes. Economic scenarios are constantly changing, people's needs change, and, along with them, organizations' needs to create value.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">No matter how accurate and detailed our planning is: change is a natural component of any project and often occurs without allowing us to foresee it.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>However, the success of a project depends on how we manage change.<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">The penultimate edition of the study <strong>Best Practices in Change Management<\/strong>, developed by the US company <em>Prosci<\/em>, showed a strong correlation between change management's effectiveness and the achievement of a project's objectives. The study revealed that an effective change management approach makes achieving project goals six times more likely.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This correlation is strengthened by the findings of the <a href=\"https:\/\/www.pmi.org\/-\/media\/pmi\/documents\/public\/pdf\/learning\/thought-leadership\/pulse\/pulse-of-the-profession-2018.pdf\"><strong>Pulse of the profession\u00ae 2018<\/strong><\/a>, the annual survey of the <em>Project Management Institute<\/em>, which revealed that <strong>changes are the leading cause of projects' failure.<\/strong><\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Hence, planning how to manage changes is the first step to avoid the failure of our project.<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">The Change Management Plan defines the roles and activities to manage and control changes within a project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Changes will be measures against the <strong>project baselines<\/strong>, representing the detailed description of the project scope, costs, and schedule.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">How to develop a Change Management Plan<\/h3>\n\n\n\n<h4 class=\"wp-block-heading\">1. Define the roles within the process<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">First of all, we need to identify who is involved in the change management process and at what level:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Who can request a change?<\/strong><\/li><li><strong>Who evaluates the request?<\/strong><\/li><li><strong>Who authorizes it?<\/strong><\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">The organization may have a Change Control Board (CCB) to authorize\/reject requests for changes. The CCB will be composed of those individuals to whom it will be necessary to submit, depending on the case, all or particular requests for changes (e.g., those that would result in a cost higher than 100k dollars or a delay of three weeks in the project schedule).\n2<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">2. Define the change management process<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Define how each change request will be submitted, evaluated, authorized, and managed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Example:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li class=\"translation-block\"><strong>Submission<\/strong> \u2013 Any stakeholder who identifies the need for a change can submit the request to the project manager by filling in and submitting a specific Change Request Form.<\/li><li class=\"translation-block\"><strong>Registration<\/strong> - As soon as received the request, the project manager will register it in a Change Log.<\/li><li class=\"translation-block\"><strong>Evaluation <\/strong>- The project manager will conduct a preliminary assessment of the impact of the change on the project by consulting the individual who requested the change and the project team.<\/li><li class=\"translation-block\"><strong>Authorization<\/strong> - The project manager will present the change request, together with the preliminary assessment, to the Change Control Board (CCB), which will decide on the approval or rejection of the request.<\/li><li class=\"translation-block\"><strong>Follow-up<\/strong>- If the request is approved, the project manager will update the project documentation to reflect these changes and notify the interested parties. Conversely, if the CCB rejects the request, the PM will communicate the decision and its reasons to the submitting stakeholder.<\/li><\/ol>\n\n\n\n<h4 class=\"wp-block-heading\">3. Develop the change management documentation<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Create a Change Request template and set up a<a href=\"https:\/\/www.miriamlanzetta.com\/en\/2021\/01\/21\/change-log-template\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Change Log<\/strong><\/a>. The Log will be the tool to collect and track all the project's change requests and the Change Control Board's decisions.<\/p>","protected":false},"excerpt":{"rendered":"<p>Changes are the leading cause of a project failure. Planning for change management is the first step to avoid the sinking of our project.<\/p>","protected":false},"author":1,"featured_media":2639,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-1070","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-risorse"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Sviluppare un piano di Change Management - Miriam Lanzetta<\/title>\n<meta name=\"description\" content=\"I cambiamenti sono la causa principale del fallimento dei progetti. Pianificarne la gestione \u00e8 il primo passo per salvaguardarli.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.miriamlanzetta.com\/en\/2021\/01\/04\/change-management-plan\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sviluppare un piano di Change Management - Miriam Lanzetta\" \/>\n<meta property=\"og:description\" content=\"I cambiamenti sono la causa principale del fallimento dei progetti. Pianificarne la gestione \u00e8 il primo passo per salvaguardarli.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.miriamlanzetta.com\/en\/2021\/01\/04\/change-management-plan\/\" \/>\n<meta property=\"og:site_name\" content=\"Miriam Lanzetta\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/miriam.lanzetta.9\" \/>\n<meta property=\"article:published_time\" content=\"2021-01-04T15:58:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-20T11:52:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.miriamlanzetta.com\/wp-content\/uploads\/2021\/01\/change-management-plan-lanzetta.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Miriam Lanzetta\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@miriamlanzetta\" \/>\n<meta name=\"twitter:site\" content=\"@miriamlanzetta\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Miriam Lanzetta\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/2021\\\/01\\\/04\\\/change-management-plan\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/2021\\\/01\\\/04\\\/change-management-plan\\\/\"},\"author\":{\"name\":\"Miriam Lanzetta\",\"@id\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/#\\\/schema\\\/person\\\/577166dd24472529c2fe640bfeb1843c\"},\"headline\":\"Sviluppare un piano di Change Management\",\"datePublished\":\"2021-01-04T15:58:04+00:00\",\"dateModified\":\"2026-07-20T11:52:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/2021\\\/01\\\/04\\\/change-management-plan\\\/\"},\"wordCount\":638,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/2021\\\/01\\\/04\\\/change-management-plan\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/wp-content\\\/uploads\\\/2021\\\/01\\\/change-management-plan-lanzetta.png\",\"articleSection\":[\"Risorse\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.miriamlanzetta.com\\\/2021\\\/01\\\/04\\\/change-management-plan\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/2021\\\/01\\\/04\\\/change-management-plan\\\/\",\"url\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/2021\\\/01\\\/04\\\/change-management-plan\\\/\",\"name\":\"Sviluppare un piano di Change Management - Miriam Lanzetta\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/2021\\\/01\\\/04\\\/change-management-plan\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/2021\\\/01\\\/04\\\/change-management-plan\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/wp-content\\\/uploads\\\/2021\\\/01\\\/change-management-plan-lanzetta.png\",\"datePublished\":\"2021-01-04T15:58:04+00:00\",\"dateModified\":\"2026-07-20T11:52:37+00:00\",\"description\":\"I cambiamenti sono la causa principale del fallimento dei progetti. Pianificarne la gestione \u00e8 il primo passo per salvaguardarli.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/2021\\\/01\\\/04\\\/change-management-plan\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.miriamlanzetta.com\\\/2021\\\/01\\\/04\\\/change-management-plan\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/2021\\\/01\\\/04\\\/change-management-plan\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/wp-content\\\/uploads\\\/2021\\\/01\\\/change-management-plan-lanzetta.png\",\"contentUrl\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/wp-content\\\/uploads\\\/2021\\\/01\\\/change-management-plan-lanzetta.png\",\"width\":1920,\"height\":1080},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/2021\\\/01\\\/04\\\/change-management-plan\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sviluppare un piano di Change Management\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/#website\",\"url\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/\",\"name\":\"Miriam Lanzetta\",\"description\":\"Strumenti per il Project Management\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/#organization\",\"name\":\"Miriam Lanzetta\",\"url\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/wp-content\\\/uploads\\\/2021\\\/01\\\/Logo_ML_B-e1639143298458.png\",\"contentUrl\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/wp-content\\\/uploads\\\/2021\\\/01\\\/Logo_ML_B-e1639143298458.png\",\"width\":1680,\"height\":297,\"caption\":\"Miriam Lanzetta\"},\"image\":{\"@id\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/miriam.lanzetta.9\",\"https:\\\/\\\/x.com\\\/miriamlanzetta\",\"https:\\\/\\\/www.instagram.com\\\/miriamlanzetta\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/miriamlanzetta\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/#\\\/schema\\\/person\\\/577166dd24472529c2fe640bfeb1843c\",\"name\":\"Miriam Lanzetta\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/984e17c07ab9f7e4aff9fdef1121af82de7d246e08f8f59afcf60040efec6f6d?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/984e17c07ab9f7e4aff9fdef1121af82de7d246e08f8f59afcf60040efec6f6d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/984e17c07ab9f7e4aff9fdef1121af82de7d246e08f8f59afcf60040efec6f6d?s=96&d=mm&r=g\",\"caption\":\"Miriam Lanzetta\"},\"sameAs\":[\"https:\\\/\\\/www.miriamlanzetta.com\"],\"url\":\"https:\\\/\\\/www.miriamlanzetta.com\\\/en\\\/author\\\/wp_6281694\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Sviluppare un piano di Change Management - Miriam Lanzetta","description":"I cambiamenti sono la causa principale del fallimento dei progetti. Pianificarne la gestione \u00e8 il primo passo per salvaguardarli.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.miriamlanzetta.com\/en\/2021\/01\/04\/change-management-plan\/","og_locale":"en_US","og_type":"article","og_title":"Sviluppare un piano di Change Management - Miriam Lanzetta","og_description":"I cambiamenti sono la causa principale del fallimento dei progetti. Pianificarne la gestione \u00e8 il primo passo per salvaguardarli.","og_url":"https:\/\/www.miriamlanzetta.com\/en\/2021\/01\/04\/change-management-plan\/","og_site_name":"Miriam Lanzetta","article_publisher":"https:\/\/www.facebook.com\/miriam.lanzetta.9","article_published_time":"2021-01-04T15:58:04+00:00","article_modified_time":"2026-07-20T11:52:37+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/www.miriamlanzetta.com\/wp-content\/uploads\/2021\/01\/change-management-plan-lanzetta.png","type":"image\/png"}],"author":"Miriam Lanzetta","twitter_card":"summary_large_image","twitter_creator":"@miriamlanzetta","twitter_site":"@miriamlanzetta","twitter_misc":{"Written by":"Miriam Lanzetta","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.miriamlanzetta.com\/2021\/01\/04\/change-management-plan\/#article","isPartOf":{"@id":"https:\/\/www.miriamlanzetta.com\/2021\/01\/04\/change-management-plan\/"},"author":{"name":"Miriam Lanzetta","@id":"https:\/\/www.miriamlanzetta.com\/#\/schema\/person\/577166dd24472529c2fe640bfeb1843c"},"headline":"Sviluppare un piano di Change Management","datePublished":"2021-01-04T15:58:04+00:00","dateModified":"2026-07-20T11:52:37+00:00","mainEntityOfPage":{"@id":"https:\/\/www.miriamlanzetta.com\/2021\/01\/04\/change-management-plan\/"},"wordCount":638,"commentCount":0,"publisher":{"@id":"https:\/\/www.miriamlanzetta.com\/#organization"},"image":{"@id":"https:\/\/www.miriamlanzetta.com\/2021\/01\/04\/change-management-plan\/#primaryimage"},"thumbnailUrl":"https:\/\/www.miriamlanzetta.com\/wp-content\/uploads\/2021\/01\/change-management-plan-lanzetta.png","articleSection":["Risorse"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.miriamlanzetta.com\/2021\/01\/04\/change-management-plan\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.miriamlanzetta.com\/2021\/01\/04\/change-management-plan\/","url":"https:\/\/www.miriamlanzetta.com\/2021\/01\/04\/change-management-plan\/","name":"Sviluppare un piano di Change Management - Miriam Lanzetta","isPartOf":{"@id":"https:\/\/www.miriamlanzetta.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.miriamlanzetta.com\/2021\/01\/04\/change-management-plan\/#primaryimage"},"image":{"@id":"https:\/\/www.miriamlanzetta.com\/2021\/01\/04\/change-management-plan\/#primaryimage"},"thumbnailUrl":"https:\/\/www.miriamlanzetta.com\/wp-content\/uploads\/2021\/01\/change-management-plan-lanzetta.png","datePublished":"2021-01-04T15:58:04+00:00","dateModified":"2026-07-20T11:52:37+00:00","description":"I cambiamenti sono la causa principale del fallimento dei progetti. Pianificarne la gestione \u00e8 il primo passo per salvaguardarli.","breadcrumb":{"@id":"https:\/\/www.miriamlanzetta.com\/2021\/01\/04\/change-management-plan\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.miriamlanzetta.com\/2021\/01\/04\/change-management-plan\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.miriamlanzetta.com\/2021\/01\/04\/change-management-plan\/#primaryimage","url":"https:\/\/www.miriamlanzetta.com\/wp-content\/uploads\/2021\/01\/change-management-plan-lanzetta.png","contentUrl":"https:\/\/www.miriamlanzetta.com\/wp-content\/uploads\/2021\/01\/change-management-plan-lanzetta.png","width":1920,"height":1080},{"@type":"BreadcrumbList","@id":"https:\/\/www.miriamlanzetta.com\/2021\/01\/04\/change-management-plan\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.miriamlanzetta.com\/"},{"@type":"ListItem","position":2,"name":"Sviluppare un piano di Change Management"}]},{"@type":"WebSite","@id":"https:\/\/www.miriamlanzetta.com\/#website","url":"https:\/\/www.miriamlanzetta.com\/","name":"Miriam Lanzetta","description":"Strumenti per il Project Management","publisher":{"@id":"https:\/\/www.miriamlanzetta.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.miriamlanzetta.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.miriamlanzetta.com\/#organization","name":"Miriam Lanzetta","url":"https:\/\/www.miriamlanzetta.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.miriamlanzetta.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.miriamlanzetta.com\/wp-content\/uploads\/2021\/01\/Logo_ML_B-e1639143298458.png","contentUrl":"https:\/\/www.miriamlanzetta.com\/wp-content\/uploads\/2021\/01\/Logo_ML_B-e1639143298458.png","width":1680,"height":297,"caption":"Miriam Lanzetta"},"image":{"@id":"https:\/\/www.miriamlanzetta.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/miriam.lanzetta.9","https:\/\/x.com\/miriamlanzetta","https:\/\/www.instagram.com\/miriamlanzetta\/","https:\/\/www.linkedin.com\/in\/miriamlanzetta\/"]},{"@type":"Person","@id":"https:\/\/www.miriamlanzetta.com\/#\/schema\/person\/577166dd24472529c2fe640bfeb1843c","name":"Miriam Lanzetta","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/984e17c07ab9f7e4aff9fdef1121af82de7d246e08f8f59afcf60040efec6f6d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/984e17c07ab9f7e4aff9fdef1121af82de7d246e08f8f59afcf60040efec6f6d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/984e17c07ab9f7e4aff9fdef1121af82de7d246e08f8f59afcf60040efec6f6d?s=96&d=mm&r=g","caption":"Miriam Lanzetta"},"sameAs":["https:\/\/www.miriamlanzetta.com"],"url":"https:\/\/www.miriamlanzetta.com\/en\/author\/wp_6281694\/"}]}},"_links":{"self":[{"href":"https:\/\/www.miriamlanzetta.com\/en\/wp-json\/wp\/v2\/posts\/1070","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.miriamlanzetta.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.miriamlanzetta.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.miriamlanzetta.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.miriamlanzetta.com\/en\/wp-json\/wp\/v2\/comments?post=1070"}],"version-history":[{"count":4,"href":"https:\/\/www.miriamlanzetta.com\/en\/wp-json\/wp\/v2\/posts\/1070\/revisions"}],"predecessor-version":[{"id":2206,"href":"https:\/\/www.miriamlanzetta.com\/en\/wp-json\/wp\/v2\/posts\/1070\/revisions\/2206"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.miriamlanzetta.com\/en\/wp-json\/wp\/v2\/media\/2639"}],"wp:attachment":[{"href":"https:\/\/www.miriamlanzetta.com\/en\/wp-json\/wp\/v2\/media?parent=1070"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.miriamlanzetta.com\/en\/wp-json\/wp\/v2\/categories?post=1070"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.miriamlanzetta.com\/en\/wp-json\/wp\/v2\/tags?post=1070"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}